Kaiser premier case study
Recycler combination unit used in a large diameter pipe Problem: Due to a need for increased capacity, a Southwestern municipality was in the planning stages of replacing a 52-year-old, 568-foot, 36-inch trunk line that fed the city wastewater treatment plant. The city had been unable to clean this pipe with traditional methods due to heavy contamination of debris and grease.Solution: The Kaiser Premier AquaStar was utilized on this line to demonstrate the recycler’s productivity to run without running out of cleaning water. The AquaStar worked the line nonstop for 5 hours utilizing a step-clean method every 50 feet, successfully cleaning 450 feet