The second major step in the planning process for an onsite system is to conduct a site review after the design has been reviewed. This allows for a comparison of what is on paper to what is on the property. It is possible that the design plan may not show constraints such as trees or recent site improvements. The design needs to match the site characteristics in the most elemental features like property lines, relative topography and features shown on the plan.
Topography evaluation
A topographical evaluation should be done as part of the site review. Although topography is considered in the
How to Conduct a Site Review for an Onsite System Installation
Many site features can impact the constructability of an onsite system, so it’s important that the design matches the site
May 26, 2022 | by Sara Heger, Ph.D. |















