Job staging is executed on the start of the construction day and includes the delegation of responsibilities to the crew and ends with a final inspection by the permitting authority and/or a walk through with the property owner.Construction notification to local authority - Some jurisdictions require a start of construction notification. If several inspections are required from the approving agency, scheduling those is important to avoid delays in the construction.Do you have everything you need on site?
1. Equipment - Rental or loaned equipment that is needed at the site and is not part of the regular fleet should be secured for delivery
System Site Plans: Completing the Installation
Tips for an organized site, from job staging and material delivery to the final walk-through with the homeowner
Aug 16, 2022 | by Sara Heger, Ph.D. |















